MITRE ATT&CK Technique
T1071
2 queries tagged with this technique.
View on MITRE ATT&CK →
-
Hunting
Hunt C2 Beacon By Connection Window Rhythm
Low-and-slow C2 beacon hunt that counts distinct hourly time windows a process was connected in — not raw connection volume.
-
Hunting
Hunt Outlook Calendar C2 Far Future Standing Meeting
Project CAV3RN's Outlook calendar C2 — standing meetings scheduled decades in the future in fixed low-attention windows, carrying operator-agent traffic in the event body.